Pure Offices provides high-quality private office space for organisations of all sizes across the UK. Their Hillington, Glasgow site offers flexible, well-designed workspaces with a strong focus on tenant well-being and adaptability. The building comprises unfurnished office suites, allowing tenants to configure the space to meet their exact needs.
Project Requirement
Pure Offices engaged Spectra Energy Group to review their Glasgow site’s energy consumption and support their wider Net Zero strategy.
The client advised an annual electricity use of 311,000 kWh, with an estimated building electricity cost of £0.40 per kWh. Our initial solar PV modelling projected that Pure Offices would directly consume approximately 98% of on-site solar generation, maximising system value and carbon reduction.
The project brief was to design and build a new Solar PV system that would reduce grid demand, lower operational costs and accelerate Pure Offices’ decarbonisation programme.
Spectra Energy Group Delivery
Spectra Energy Group acted as Principal Contractor, managing the full project lifecycle under normal working hours. We provided:
Our responsibilities covered full design and build (D&B) deliverables from feasibility to
Design & System Selection
Spectra Solar is fully MCS accredited. Although certification is not required for systems over 50 kW, our design and installation processes followed all industry best practices.
The final solution utilised a SolarEdge system, designed to maximise output, enhance safety and mitigate shading losses.
System Specifications
Key Design Considerations
Installation Works
Although the project was non-notifiable, Spectra elected to adopt full safety and compliance procedures, including:
A structural engineer was engaged to assess roof load capacity for the proposed system. The structure was confirmed suitable, and certification was issued to proceed.
On site, an SMSTS-trained Project Engineer managed:
The installation was delivered within three weeks, followed by full system commissioning and handover.
Pure Offices expressed strong satisfaction with the project, praising the high-quality installation, smooth delivery process and minimal disruption to operations.
The new Solar PV system is performing exactly as designed and now represents the largest solar installation across the entire Pure Offices UK portfolio.
This project marks a significant milestone in helping Pure Offices advance toward their Net Zero targets, and the client has expressed interest in continuing the partnership on future decarbonisation initiatives.