• HVAC Building Services
  • Residential Air Conditioning
  • Solar PV
  • Electrical
  • More
    • About
    • Contact

Reduce Your Carbon Footprint, Save Your Pocket

  • Spectra House, 13-15 Pennington St Wigan, WN2 3AH
  • 0333 1887 107
  • info@spectraenergygroup.co.uk
    • HVAC Building Services
    • Residential Air Conditioning
    • Solar PV
    • Electrical
    • More
      • About
      • Contact
  • info@spectraenergygroup.co.uk
  • 0333 1887 107
Spectra Energy Group
Spectra Energy Group
  • HVAC Building Services
  • Residential Air Conditioning
  • Solar PV
  • Electrical
  • More
    • About
    • Contact
Free Quote

Pure Offices Cheltenham VRF AC & Electrical Mains Power Installation

Spectra Energy Group > AC > Pure Offices Cheltenham VRF AC & Electrical Mains Power Installation

Pure Offices provide a wide range of private office space to rent in Cheltenham, offering high-standard workplaces for organisations of all sizes. The building has been designed to prioritise flexibility and well-being, with unfurnished office suites allowing tenants to shape the space to their own needs.

Project Requirement

Deloitte LLP occupies the second-floor right-hand wing of the Cheltenham site, consisting of 10 cellular offices, including a mixture of meeting rooms and general staff offices.

The base building is heated via a central boiler plant and radiators throughout. However, Deloitte LLP required an independent system to provide comfort cooling and primary heating specifically for their leased office accommodation.

Spectra Energy Group Delivery

Spectra Energy Group acted as main contractor, completing the project predominantly out of hours to minimise disruption. Our full design and build (D&B) responsibilities included:

Design & System Selection

  • Initial design survey of the building
  • Selection of a new Samsung VRF air conditioning system
  • Design and installation of a bespoke plant area for the external condensing unit

Installation Works

  • Full installation of the VRF system including internal and external plant
  • Electrical mains power design and installation, including fitting a dedicated kWh meter
  • All associated builders’ works for the external condenser compound

Fan Coil Units & Controls

  • 9 Samsung compact 4-way cassette fan coil units installed within the cellular offices
  • 1 Samsung Wind-Free wall-mounted unit installed where space restrictions required
  • Individual room controllers in each office with ±3°C adjustment from a 21°C baseline setpoint
  • Installation of a Samsung central controller with a 7-day timeclock and automated stop signals to prevent unnecessary operation outside of business hours

Energy Monitoring

A dedicated kWh meter was installed on the condensing unit electrical supply, giving Pure Offices full visibility of Deloitte LLP’s energy consumption over the year.

End Result / Client Feedback

Deloitte LLP received a new energy-efficient Samsung heat recovery VRF system, delivering:

  • COP of 4.2
  • ROI of under 7 years
  • Expected equipment lifecycle of 20+ years

The client also benefits from a 7-year extended manufacturer parts warranty, providing long-term assurance.

All work was completed out of hours with zero disruption to building occupants. Pure Offices commended Spectra for providing full main-contractor oversight, including:

  • Access and egress management
  • Fire alarm isolations
  • Nightly permits for general and hot works
  • Leaving the building clean, tidy and operational each morning
The project was delivered smoothly, efficiently and to a high standard, with all new systems performing as designed. Works carried out smoothly and efficiently with all systems installed to a high standard.

Project Details

  • Category: AC
  • Location: Pure Offices Office Park Hatherley Lane Cheltenham GL51 6SH
Spectra Energy Group
Spectra Energy Group formed in 2021, with over 40 years combined experience, we are a specialist renewable energy contractor, who specialise in the de-carbonisation of commercial & domestic properties throughout the UK.

Contact Info

  • Spectra House, 13-15 Pennington St Wigan, WN2 3AH
  • 0333 1887 107
  • info@spectraenergygroup.co.uk

Latest Posts

Building Maintenance Compliance January 21, 2026
Hotel HVAC Services January 21, 2026
HVAC Facilities Management January 12, 2026

Quick Links

Privacy Policy
Terms & Conditions

©copyright 2026.