Stanlow 6 (“Blue Building”) accommodates a large number of multi-skilled ESSAR Oil UK engineers and senior managers. The building consists of a large open-plan office area with perimeter cellular offices.
Project Requirement
The property was previously served by 3No. 22-year-old Hitachi VRF systems each operating on R22, a refrigerant that is now banned under F-Gas regulations. In addition, parts for the existing system were obsolete and the plant had reached end of life.
Ventilation to the building was provided by an AHU with a steam heating coil, supplying filtered fresh air and heated supply air via the legacy steam system.
Spectra Energy Group was appointed to design, install and commission a new energy-efficient heat recovery VRF system, to undertake a full deep clean of the existing AHU ventilation ductwork, and to install new control systems and electrical mains power to serve the plant.
Spectra Energy Group Delivery
Spectra acted as main contractor, delivering the project with on-site teams working predominantly out of hours to avoid disruption to ESSAR operations.
Our full design and build scope included:
End Result / Client Testimonial
ESSAR Oil UK Ltd received a new low-GWP, energy-efficient Samsung heat recovery VRF system delivering a COP of 4.3, an ROI of under 7 years, and an expected equipment life cycle of 20+ years.
The client also benefits from a 7-year extended manufacturer parts warranty, with Spectra providing the ongoing pre-planned maintenance.
All work was completed out of hours with zero disruption to ESSAR operations. Spectra fulfilled full main-contractor responsibilities, including: